Selected Stormwater Improvements Projects

The map below shows the locations of selected stormwater improvement projects.

Construction will begin in October 2025

Overall Map.png
ImprovementArea9.png
Green Valley Subdivision

This project will primarily include the design of new storm sewers along Cedar Ave to relieve the storm water flows in the back-yard ditch between Cedar and Maywood. Additionally, the large corrugated metal pipes that run on the north side of the project area from Raytown Road to Maywood Ave will be rehabilitated via spot repairs and Cured In-Place Pipe Lining.

Click map to enlarge

ImprovementArea19.png
Gregory Heights

This project will include the design and construction of a brand-new storm sewer system along Ditzler Ave into Ong Lake. Storm sewers will also be installed on each of the connecting streets in order to collect rainfall and carry it to the main trunk sewer on Ditzler Ave. The open ditch at the south end of Ditzler which connects the street to the lake will be enclosed to provide additional safety and reduce maintenance costs.

Click map to enlarge

ImprovementArea20.png
G. A. Huth Addition

This project will include new storm sewers in places where currently overland flow ditches are used to convey stormwater from outside the City limits to the ponds. This is intended to reduce standing or flowing water on private properties. Some rehabilitation work on the west bank of Elwood’s Pond will also be completed to stabilize and clean up the bank.

Click map to enlarge

ImprovementArea25.png
Raytown Manor

This project will include the enclosing of the back-yard ditches between Northern Ave and Harris Ave. This ditch has been incredibly difficult to maintain due to very limited access so enclosing it in piping will allow easier maintenance. Additionally, the open ditch that conveys stormwater flows from 59th Street to the south, between Hedges Ave and Northern Ave, will be enclosed to reduce standing and flowing water on private property.

Click map to enlarge

ImprovementArea26.png
Eastside Industrial District

This project will construct new storm sewers along 65th Street to convey stormwater flows from Railroad St to Hadley St. This will also include street re-design of 65th St and Hadley St to provide new pavement, curb and gutters, and new storm sewer inlets. Additionally, some rehabilitation work on the storm sewers along Hardy Ave will be completed to fix broken and aging infrastructure in this area.

Click map to enlarge

ImprovementArea28.png
Wildwood Estates

This project will include new storm sewers along Woodson Rd to replace the current open road-side ditches that are used to convey storm flow. The new storm sewer construction will also include new sidewalk to allow for pedestrian traffic along the busy roadway.

Click map to enlarge

Mayview Addition

This project will include construction of new storm sewer pipes on private properties that will connect 66th Ter to 67th Ter. Currently, the stormwater flow is conveyed via overland flow which results in standing and flowing water on the private properties in this area. The new storm pipes and structures will allow for enclosed stormwater flow and will make it easier for the City to maintain this infrastructure.

Click map to enlarge

ImprovementArea77.png

City of Raytown - Stormwater Bond Projects

This website is for education purposes only.
Paid for by the City of Raytown.